Available Documents
NEW! Final Environmental Impact Report (published October 30, 2009)
The Draft EIR, published on January 30, 2009, assessed the potential impacts of the CWP and alternatives. This document, the Final EIR, consists of the revised EIR (Volumes 1 through 3: Executive Summary, Chapters 1 through 10, and appendices), as well as a comments document (Volume 4, Chapters 11 and 12) and a response-to-comments document (Volume 5: Chapters 13 through 14).
Additional comments on the FEIR cannot be considered as part of the EIR; however, the CPUC Public Advisor can accept correspondence regarding this matter. Any such correspondence will be included in the Correspondence File for this proceeding.
CPUC Public Advisor
505 Van Ness Avenue, Room 2103
San Francisco, CA 94102
public.advisor@cpuc.ca.gov.
- Volume 1 (Cover - PDF, 135KB)
- Volume 2 (Cover - PDF, 138KB)
- Volume 2 Table of Contents (PDF, 124KB)
- Sections 4.7-4.14 Environmental Setting, Impacts and Mitigation Measures: Moss Landing and North Marina Project (PDF, 14.7MB)
- Section 5 Regional Project Description (PDF, 3.6MB)
- Section 6 Environmental Setting, Impacts and Mitigation Measures: Regional Project (PDF, 2.6MB)
- Section 7 Alternatives (PDF, 5.7MB)
- Section 8 Growth Inducement Potential and Secondary Effects of Growth (PDF, 313KB)
- Section 9 Cumulative Impacts (PDF, 1.5MB)
- Section 10 Draft EIR Authors (PDF, 102KB)
- Volume 3 Appendices (Cover - PDF, 138MB)
- Volume 3 Table of Contents (PDF, 115KB)
- A. Scoping Report(PDF, 15.7MB)
- B. Monterey Peninsula Water Management District Technical Memorandum 2006-02 (PDF, 2.4MB)
- C. Rosenfeld, L., Combined Effluent Dilution Calculations for Moss Landing Power Plant, 2008 (PDF, 809KB)
- D. Flow Science Inc., MRWPCA Brine Discharge Diffuser Analysis, September 9, 2008 (PDF, 1MB)
- E. Geoscience, North Marina Ground Water Model Evaluation of Potential Projects, July 25, 2008 (PDF, 5.9MB)
- F. Air Quality Data (PDF, 488KB)
- G. Air Quality Health Risk Assessment (PDF, 1MB)
- H. Land Use, Agriculture, and Recreation (PDF, 270KB)
- I. Regional Plenary Oversight Group (REPOG) (PDF, 160KB)
- J. Regional Project: Certified Environmental Impact Reports Summary of Findings (PDF, 9.1MB)
- K. Plan B Component Screening Report (PDF, 1.8MB)
- L. Technical Memorandums: Results of GEOSCIENCE North Marina HDD Study, RBF Consulting, April 27, 2005; HDD Well Supply, RBF Consulting, May 2005 (PDF, 4.1MB)
- M. Memorandum: Segunda Pipeline Alternatives Analysis, RBF Consulting, February 14, 2007 (PDF, 2.6MB)
- N. Technical Memorandum: Monterey Regional Water Supply Evaluation: Evaluation Summary, RMC Water and Environment, prepared for Monterey Regional Plan Work Group, January 25, 2008 (PDF, 4.2MB)
- O. Secondary Effects of Growth (PDF, 203KB)
- P. Groundwater Modeling Simulation of Impacts for Monterey Regional Water Supply Project, 20,000 AFY Desalination Pumping Scenario (Scenario 4d) Technical Memorandum (PDF, 5.3MB)
- Q. Technical Memorandum: Changes in the DEIR Phase 1 Project, Marina Coast Water District, California American Water, and Monterey County Water Resources Agency, October 15, 2009 (PDF, 10.5MB)
- Volume 4 (Cover - PDF, 138KB)
- Volume 5 (Cover - PDF, 130KB)
Comments received during the public comment period on the Draft
Environmental Impact Report (PDF, 48.9 MB)
Click here to view a summary of the comments received at our March public meetings. A summary of all comments received will be posted May 1, 2009. (PDF, 57 KB)
Notice to extend DEIR Comment Period (March 16, 2009) (PDF, 16 KB)
A copy of the DEIR presentation from the public meetings is available for download (PDF, 940 KB).
Draft Environmental Impact Report (January 30, 2009) The Draft EIR has identified significant environmental effects in the following areas: surface water resources; groundwater resources; biological resources; hazards and hazardous materials; geology, soils, and seismicity; traffic; cultural resources; air quality; noise; visual resources; land use; public services and utilities; agricultural resources; and energy. The Draft EIR identifies measures that could reduce most of these impacts to less-than-significant levels. Some pipeline alignments proposed under the project are near sites identified on lists compiled in accordance with Government Code Section 65962.5 (potential hazardous waste sites).
- Volume I
- Volume II
- Volume III
Regional Water Supply Program (PDF, 8.7 MB)
Monterey Regional Water Supply Program, EIR Project Description. Provided to the CPUC on June 4, 2008. Prepared by RMC for California American Water, Marina Coast Water District, Monterey County Water Resources Agency, and the Monterey Regional Water Pollution Control Agency.
Proponent’s Environmental Assessment (July 2005)
Submitted by CalAm, outlines the foreseeable environmental impacts and helps the Commission focus its EIR efforts.
Notice of Preparation (Sept. 29, 2006)
CPUC’s Notice of Preparation on the EIR for the CWP; inviting resource agencies and the public to offer input on the scope of the document, which will detail the potential marine and terrestrialbiological, water/air quality, noise/vibration, visual/aesthetic, land use, growth inducing and transportation/traffic impacts of the proposed project and alternatives.
Notice of Availability (Sept. 29, 2006)
Agency and Public Scoping Meetings Announcement (held Oct. 24–26, 2006)
Time, place, site and other details regarding the CEQA public meeting that allowed the public to comment on the scope of the Environmental Impact Report.
Agency and Public Scoping Meetings Presentation (PDF, 708KB)
Coastal Water Project Scoping Report (December 2006)
Applicant's Proposed Project Map (April 2007)
Alternative Project Map (April 2007)
|